This project is located in West Uhumuqin Banner Huaaobao silver mine technical transformation project is located in West Uhumuqin Banner, Inner Mongolia autonomous region, about 25km to the northwest of Baori Getai, the administrative division of Baiyinhua Town, West Uhumuqin Banner. The geographical coordinates of the mining area are: East 118956'30"~118°59'30": North 45015'15"~45016'15". After the technical reform will be based on the type and composition of ore, the use of advanced and applicable beneficiation process, improve the recovery rate and comprehensive utilization of resources level, the use of semi-self-grinding process to replace the existing crushing process, the use of flotation method to separate copper, and zinc, sulfur, improve the recovery rate of beneficiation and resource utilization water, is in line with the "three lines one single" key projects.
The company focused on the construction of XCF/KYF-40 flotation machine 26 tank, XCF/KYF-16 flotation machine 17 tank, and DCS\ local box two control starting cabinet 19 sets.
Copyright © Zhejiang Golden Machinery Factory
All Rights Reserved.