The project is located in Tehran, a continental semi-arid climate, with a temperature of 43°C and an temperature of -15°C. This project was led by Faravarie MES Derakhshan Takht Ganbad Company. According to the special requirements of the mining area, the relevant flotation machines were newly developed and innovated. Under this background, our company developed the cylindrical KYF flotation machine for the time and adopted the stepped configuration on site. Among them, KYF-130 flotation machine is a very large flotation machine that is not widely used at present, which has accumulated valuable experience and wealth for overseas transportation and on-site installation and debugging of our company's very large equipment.
Recommended case:
- Annual output of 480,000 tons of potassium sulfate processing plant construction project -- Qinghai Bindi Potash Fertilizer Co., Ltd.
- Annual output of 500,000 tons of potassium chloride phase I project -- Laos Kameng Kaiyuan potash fertilizer
- Comprehensive utilization project of tailings mica and iron separation with an annual output of 4.5 million tons -- Anhui Jinrisheng Mining Co., Ltd.
- Flotation technical reform project of 3000 tons per day -- Yunnan Jinding Zinc Industry Co., Ltd.
- Annual output of 600,000 tons of phosphorus powder renovation project -- Beipiao Xingwang Mining Co., Ltd.
- Ilmenite recovery project (titanium and iron separation) project -- Pangang Group New White Horse Mining Co., Ltd.
- Annual output 1.5 million tons of expansion project -- Hebei Caijiaying and zinc mine
- Annual output of 300,000 tons of potassium sulfate project -- Qinghai CITIC Guoan Science and Technology Development Co., Ltd.
Content of construction:
The company focused on the construction of KYF-20 flotation machine 10 tanks, KYF-50 flotation machine 8 tanks, KYF-130 flotation machine 3 tanks.