500,000 tons/year iron tailings and phosphorus integration relocation project -- Chengde Tianbao Mining Group Baohai Co., Ltd.
Project Introduction:
The project is located in Chengde City Pingquan County Wolong Town Niangniangmiao Village nine 500m west, covers an area of 116.36 acres. The tailings pond is located in a natural mountain gully 2km southwest of the concentrator, with an effective storage capacity of 42.572 million m³. The production scale is 1000-1200t/h (processing iron tailings and phosphorus), the raw ore material properties: -200 mesh 35%, the concentration of 35%-40%, the proportion of ore 3.1t/m³.
Recommended case:
- Annual output of 480,000 tons of potassium sulfate processing plant construction project -- Qinghai Bindi Potash Fertilizer Co., Ltd.
- Annual output of 500,000 tons of potassium chloride phase I project -- Laos Kameng Kaiyuan potash fertilizer
- Comprehensive utilization project of tailings mica and iron separation with an annual output of 4.5 million tons -- Anhui Jinrisheng Mining Co., Ltd.
- Flotation technical reform project of 3000 tons per day -- Yunnan Jinding Zinc Industry Co., Ltd.
- Annual output of 600,000 tons of phosphorus powder renovation project -- Beipiao Xingwang Mining Co., Ltd.
- Ilmenite recovery project (titanium and iron separation) project -- Pangang Group New White Horse Mining Co., Ltd.
- Annual output 1.5 million tons of expansion project -- Hebei Caijiaying and zinc mine
- Annual output of 300,000 tons of potassium sulfate project -- Qinghai CITIC Guoan Science and Technology Development Co., Ltd.
Content of construction:
The company focused on the construction of XCF/KYF-40 flotation machine 13 cells, XCF/KYF-24 flotation machine 10 cells, the φ3.5x3.5m, the φ2x2m preparation tank and mixing tank a total of 5 sets, as well as related automation equipment.

