The total land area of the project is 538.2k square meters, with a total investment of more than 1.213 million yuan. It is located in the Xindeng Industrial functional area of Fuyang District, Hangzhou. It is the second phase project of electrolytic copper technology upgrading and transformation. With independent intellectual property rights of a kind of enriched side blown melting tank smelting copper sulfur production technology, the production capacity of 200,000 tons of mineral crude copper, 800,000 tons of sulfuric acid, 270,000 tons of electrolytic copper.
The company focused on the construction of CLF-40 flotation machine 11 tanks, CLF-8 flotation machine 9 tanks, as well as part of the preparation tank and mixing tank.
Copyright © Zhejiang Golden Machinery Factory
All Rights Reserved.