Chifeng Cloud Copper in response to the Chifeng municipal government's call for enterprises in the built up area to retreat into the park, considering the long-term development of enterprises, in 2017, the gradual implementation of 400,000 tons of environmental protection upgrading and relocation project, the overall site of the plant moved to the high-tech industrial development zone of Yuanbaoshan Marin non-ferrous Metal Industrial Park. The project uses mixed copper concentrate as raw material. The smelting process includes double-side blowing smelting, continuous blowing, rotary anode furnace refining, and conventional current density bidirectional parallel flow electrolysis process. The new plant has built two sets of independent production systems, each with an annual capacity of 200,000 tons.
The company mainly engaged in the construction of 16 cells of CLF-40 flotation machine, 9 cells of CLF-16 flotation machine, as well as some preparation tanks and stirring tanks lined with wear-resistant ceramic powder coating.
Copyright © Zhejiang Golden Machinery Factory
All Rights Reserved.