Potassium-magnesium special fertilizer and all water soluble potassium sulfate industrial test project -- SDI Xinjiang Lop Nur Potassium Salt Co., Ltd.
Project Introduction:
The project is located in Bayingoleng Mongolian Autonomous Prefecture, Xinjiang Uygur Autonomous Region, which is 383km from Hami City in the northeast, 542km from Korla in the west and 470km from Dunhuang City in the east. The processing plant is about 1.5 km northeast of the planned Lop Nur Town, on the north side of the Harolo Road. It is a typical continental arid climate with an annual average temperature of 12.4℃ and a monthly average temperature of -8.5~7.1℃. The annual average relative humidity is 35.7%, the wind speed can reach 10, and the wind speed is 33m/s.
Recommended case:
- Annual output of 480,000 tons of potassium sulfate processing plant construction project -- Qinghai Bindi Potash Fertilizer Co., Ltd.
- Annual output of 500,000 tons of potassium chloride phase I project -- Laos Kameng Kaiyuan potash fertilizer
- Comprehensive utilization project of tailings mica and iron separation with an annual output of 4.5 million tons -- Anhui Jinrisheng Mining Co., Ltd.
- Flotation technical reform project of 3000 tons per day -- Yunnan Jinding Zinc Industry Co., Ltd.
- Annual output of 600,000 tons of phosphorus powder renovation project -- Beipiao Xingwang Mining Co., Ltd.
- Ilmenite recovery project (titanium and iron separation) project -- Pangang Group New White Horse Mining Co., Ltd.
- Annual output 1.5 million tons of expansion project -- Hebei Caijiaying and zinc mine
- Annual output of 300,000 tons of potassium sulfate project -- Qinghai CITIC Guoan Science and Technology Development Co., Ltd.
Content of construction:
The company focused on the construction of 316L composite plate material preparation tank and mixing tank a total of 16 sets, in addition to the related 316L mixing assembly, 316L heating coil, 316L composite plate tank body cover and a series of supporting facilities.


