Project Introduction:

The project is located in the north of the Tropic of Capricorn, but due to the high average altitude, more of the area has a subtropical climate. The temperature can reach 35℃; The temperature is just below 10 ° C. The process of lithiolite mineral processing mainly includes crushing, grinding, flotation, dehydration and drying steps. First, the ore is initially crushed and ground to achieve the appropriate particle size, then flotation separation is carried out, and finally pure lepidolite is obtained through dehydration and drying treatment.

Content of construction:

 The company focused on the construction of XCF/KYF-40 flotation machine 13 cells, XCF/KYF-24 flotation machine 10 cells, the φ3.5x3.5m, the φ2x2m preparation tank and mixing tank a total of 5 sets, as well as related automation equipment.